Ingegneria
Viaduct on SS17 Road
Services rendered

Final design of the new deck replacing the existing structure, including rehabilitation and strengthening works on piers and abutments.

Significant data
Tipology
Continuous composite steel–concrete deck
Number of spans
6
Length
201 m
Maximum span
34 m
Maximum width
12.5 m
Structural steel
715 t
Concrete volume
770 mc
IRON INGEGNERIA S.R.L.
P.IVA 04431850983
INFO@IRONINGEGNERIA.IT
+39 02 8342 4913

IRON INGEGNERIA S.R.L.
P.IVA 04431850983

INFO@IRONINGEGNERIA.IT
+39 02 8342 4913