Ingegneria
Strengthening Works on Two Viaducts Along the Ferrandina–Matera Railway Line
Services rendered

Detailed design of foundation strengthening interventions for the abutments of two railway viaducts.

Significant data
Tipology
Simply supported prestressed reinforced concrete girders
Number of spans
1+1
Length
16+16 m
Maximum span
16 m
Maximum width
7.4 m
IRON INGEGNERIA S.R.L.
P.IVA 04431850983
INFO@IRONINGEGNERIA.IT
+39 02 8342 4913

IRON INGEGNERIA S.R.L.
P.IVA 04431850983

INFO@IRONINGEGNERIA.IT
+39 02 8342 4913