Ingegneria
Cycle and Pedestrian Footbridge in Seveso
Services rendered

Detailed design of the deck, vertical pier, abutment, foundations, and temporary works.

Significant data
Tipology
Through-girder steel deck
Number of spans
1 span plus overhang
Length
37 m
Maximum span
30 m
Maximum width
4 m
Structural steel
29 t
Concrete volume
65 mc
IRON INGEGNERIA S.R.L.
P.IVA 04431850983
INFO@IRONINGEGNERIA.IT
+39 02 8342 4913

IRON INGEGNERIA S.R.L.
P.IVA 04431850983

INFO@IRONINGEGNERIA.IT
+39 02 8342 4913